What is Title 5?
Title 5 regulates on-site disposal systems (septic systems) in the state of Massachusetts
When is a Title 5 Inspection required?
Shared systems
Shared systems are required to be inspected every 3 years
Sale of a Property
Title 5 inspections are required within 2 years of the sale of a property
Large systems
For systems between 10,000 - 15,000 Gallons per day, inspections are required every 5 years on the Basin Schedule
Required by Board of Health
The Board of Health can choose to require a title 5 inspection in specific instances
What happens in a Title 5 Inspection?
Septic Tank components get uncovered
Groundwater elevation is determined
System is evaluated for functionality and compliance
Proximity to wells, waterbodies, and wetlands is determined
Your Results
Your septic system will meet one of the four following criteria
Conditional Pass
Your system will pass if a specific component is repaired
Further Evaluation Required
This happens in very specific instances. The board of health will determine the next steps.
Pass
You are good to go!
Fail
The system will need to be replaced. The board of health will determine the next steps.
Contact
Phone Number: 351-201-2210
Email: israel@berltitle5.com
North Reading, MA 01864